Tuesday, 3 July 2012

sussex progress

Laying out the Points
Later in to June the second of the turnouts was laid.

Prior to that second laying out.
(SG)


located to the east of Oak tree siding.

The running road curves to the left of these points. The spur to the engine shed continues to the right.
(AS)
(AS)

(AS)

Source. Photos are copyright.

Excellent work going on down in East Sussex on the formerly 'lost' section of the KESR thanks to the ROTHER VALLEY RAILWAY! A lot of fools said this would never happen but slowly and surely the KESR is being linked backed to the Network, essential if the line (and of course the towns/villages en route) are to survive Peak Oil. 

No comments: